What we are usually called out for
Production-floor epoxy lifting from below. Slab moisture drive on a ground-bearing pour with no vapour barrier — the primer is the fix, not a thicker topcoat.
The building stock
Dense mid-rise residential and a strip of food and beverage production. Both extremes: a five-storey walk-up and a production floor that washes down hot.
- Province
- Laguna
- Mobilisation
- Same day. Roughly 25 minutes from the yard.
- Projects here
- 4 in the register
Work delivered in San Pedro
Pepsi-Cola production area, San Pedro
For Pepsi-Cola Products Philippines, Inc.
San Pedro, Laguna
Five-storey building, San Pedro
Applied under Malasaga Trading Corporation
San Pedro, Laguna
Six-storey building, San Pedro
Applied under ABSYA Builders
San Pedro, Laguna
Robinsons Galleria, San Pedro
Direct engagement
San Pedro, Laguna