What we are usually called out for
Production-floor epoxy lifting from below. Slab moisture drive on a ground-bearing pour with no vapour barrier — the primer is the fix, not a thicker topcoat.
The building stock
Dense mid-rise residential and a strip of food and beverage production. Both extremes: a five-storey walk-up and a production floor that washes down hot.
- Province
- Laguna
- Mobilisation
- Same day. Roughly 25 minutes from the yard.
- Projects here
- 4 in the register
Work delivered in San Pedro
Pepsi-Cola production area, San Pedro
For Pepsi-Cola Products Philippines, Inc.
San Pedro, Laguna
Five-storey building, San Pedro
Applied under Malasaga Trading Corporation
San Pedro, Laguna
Six-storey building, San Pedro
Applied under ABSYA Builders
San Pedro, Laguna
Robinsons Galleria, San Pedro
Direct engagement
San Pedro, Laguna
Other areas we cover
Send us the scope.
Attach drawings or a BOQ to a quotation request, or book a date for a site inspection. Both paths reach the same engineers.