Skip to content
INTRICJSMINTRIC JSM Waterproofing and Painting Works — home

Laguna · service area

Waterproofing in Santa Rosa

Higher and better drained than Biñan, so below-grade pressure is less of a driver. What dominates instead is thermal load: large exposed roof decks and steel-framed sheds baking through the dry season, which is an elastomeric and coating problem rather than a membrane one.

What we are usually called out for

Roof deck coatings applied thin — two coats of elastomeric to a coat count rather than to a dry-film build, failing in the second wet season.

The building stock

Amusement, retail and a heavy concentration of light manufacturing and logistics. Facilities managers here buy directly and want the work done inside a shutdown window.

Province
Laguna
Mobilisation
Same day from Biñan. Roughly 20 minutes on SLEX outside peak.
Projects here
1 in the register

Work delivered in Santa Rosa

Other areas we cover

Send us the scope.

Attach drawings or a BOQ to a quotation request, or book a date for a site inspection. Both paths reach the same engineers.

Book inspectionRequest quotation